Products

  • 0
  • 0

Global Foam Lightweight market trend 2023-2027 Construction Precautions for Foam Lightweight Soil by Newshotel-cisar

From April the French government will reduce fuel taxes slightly to ease the burden on consumers. 

Warned of possible energy shortages in France by the end of the year and called on the French to conserve electricity and gas from now on, saying that if nothing was done, The energy situation will be tough this winter. Some experts say that there are two main reasons for France's energy crisis: first, the conflict between Russia and Ukraine affected the gas market and caused supply tension; The second is a safety review of France's newest nuclear power plant, which may lead to a reduction in output this year. In order to alleviate the energy crisis, the whole French society needs to be mobilized, whether it is the industrial sector, the tertiary sector or every French citizen. Now it is urgent. Rising fuel prices may also have an impact on shipments of the Foam Lightweight. 


The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh, and the lap joint shall be thermally welded, and the lap width shall not be less than 10cm. 

When laying, it should be flattened and tightened to avoid local rolling up. If necessary, U-shaped nails can be used for anchoring. When laying the metal mesh, U-shaped nails should be used for anchoring, the longitudinal anchorage spacing is 2m, and the transverse anchorage spacing is 1.0m. The plane position of the metal mesh should be overlapped and overlapped, the width of the overlap should not be less than 5cm, and the overlap should be bound with plastic buckles and anchored with U-shaped nails.


Before the light soil is poured, according to the boundary conditions of the construction site, the pouring area and the pouring layer are first divided, and the base is checked to ensure that the base is free of debris and water, and that the base elevation meets the design requirements and should meet the following requirements:

1) The top surface area of a single pouring area should not exceed 400m2.

2) The length in the long axis direction of a single pouring area should not exceed 20m.

3) 1.8cm thick wooden plywood is used to support the spacing and joints in the adjacent pouring area. The wooden plywood is a temporary support template and is also used as a deformation joint filling and must not be removed.

4) The thickness of the single-layer pouring layer should be controlled within the range of 0.3-1.0m.

5) The thickness of 0.8m at the top of the light soil subgrade must be used as an independent single-layer pouring layer, and the layer should be poured at one time in each pouring area.


Construction Control Points

1) For the adjacent pouring layers in the same section, when the temperature during the construction period is not lower than 15℃, the shortest pouring interval can be controlled by 8 hours; otherwise, the pouring interval should not be less than 12 hours.

2) The pouring construction time of the pouring layer in a single pouring area of foam light soil should be controlled within 2 hours.

3) It should be poured from one end to the other end along the long axis of the pouring area; if more than one pouring pipe is used for pouring, it can be poured side by side from one end, or the diagonal pouring method can be used.

4) During the pouring process, when the pouring pipe needs to be moved, it should be moved back and forth along the direction in which the pouring pipe is placed, and it is not appropriate to move the pouring pipe left and right; Move to the soil surface.

5) During the pouring process, the discharge port of the pouring pipe should be placed below the current pouring surface as much as possible; in other cases such as the surface being smoothed, the distance between the discharge port of the pouring pipe and the current pouring surface should not be higher than 1.5m.

Care and Maintenance

After the top surface of the light soil pouring area is poured to the design elevation, the surface should be covered with plastic film to moisturise and maintain the light soil roadbed; or non-woven geotextile covering and watering should be used for maintenance. The curing time is not less than 7 days. 

Before the top of the light soil subgrade is filled with soil, it is strictly forbidden to drive construction machinery on it; if it is unavoidable in some areas, a temporary protective layer with a thickness of not less than 50cm should be laid at a suitable position or covered with steel plates as a temporary access road for Construction machinery travels.


Connection with other processes

The top improved soil must be constructed when the maintenance strength of the light soil under the same conditions reaches 1.5MPa. During construction, it is strictly forbidden for large machinery such as dump trucks, road rollers, and bulldozers to directly walk on the top surface of the light soil. Paving and rolling are carried out in the forward way of leveling and rolling, that is, unloading trucks and road rollers should unload and walk at the rear end of the leveling machine.


During the rainy season, special measures should be taken to prevent and drain the water and soil, especially to prevent water and soil loss. Measures such as film covering and setting of temporary drainage ditches should be adopted to avoid slope erosion and prevent a large amount of water and soil from flowing to the lower light soil pouring surface for pollution. Light soil.


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


With Russia taking the lead on Poland and Bulgaria at the end of last month, there appears to be a growing sense of compromise within the EU over whether to accept Moscow's proposed rouble settlement order. 

Italy's prime minister said recently that European companies would be able to buy gas in roubles without violating sanctions.  This apparently ignores the guidance of hardliners in the EU to "fight to the end". 

For weeks, European companies have been trying to find ways to meet Russia's payment demands for the rouble while maintaining vital gas supplies without violating sanctions against Moscow. 

Late last month, European Commission President Von der Leyen said operating under the mechanism would violate sanctions and asked European companies not to bow to Russian demands. However, the EU has yet to issue more rigorous written guidelines on how companies should pay Gazprom. 

The Italian prime minister said recently, "There is no official announcement from the European Union about what ruble settlement means for sanctions violations, and no one has said whether ruble payments violate sanctions or not. It's a grey area." 

"In fact, most gas importers are already opening rouble accounts for deals with Gazprom,"

He also used German companies as a shield. He said Germany's largest gas importer had already paid in rubles. "In fact, we saw evidence yesterday that the largest gas importer in Germany has already paid in rubles."

Inquery us

Our Latest Products

Global Inconel 718 Alloy market trend 2024-2028 Properties and Applications of Inconel 718 Alloy by Newshotel-cisar

Inconel 718 alloys is a precipitation-hardening nickel-iron-based superalloy containing niobium and molybdenum. Its microstructure is austenite and has excellent comprehensive properties.…

Global Sodium stearate,Overview of Sodium Stearate,Application of sodium stearate,Sodium stearate price,Sodium stearate supplier market trend 2025-2026 Overview and application of sodium stearate by Newshotel-cisar

Sodium stearate is also known as sodium octadecanoate. White fine powder or block, widely used in the manufacture of toothpaste, soap, cosmetics, as well as waterproofing agents, plastic stabilizers, adhesives, etc.…

Global market trend 2025-2026 Does the international oil price extended decline have an impact on the javasctip slit by line market by Newshotel-cisar

International oil prices extended their decline after comments from Federal Reserve Chairman Jerome Powell added to concerns that U.S. interest rate hikes will slow economic growth and data from the American Petroleum Institute showed U.S. crude inve…